2017 Roadway Improvement Project
2017 Roadway Improvement Project
Notice of Start of Construction
Contractor: Tilcon Connecticut, Inc.
New Britain, CT
Construction activities are scheduled to start in May, 2017 and continue through November, 2017.
Roadwork will consist of pavement reconstruction, installation of new curbing, manhole adjustments, utility structure adjustments, sidewalk ramp construction, pavement markings, new street & regulatory signs, and restoration of disturbed areas.
The following roads will be reconstructed using pavement reclamation methods:
- Adams Street – Vine Street to Murray Street
- Edward Street – Prospect Street to Stanley Street
- Greene Terrace – Main Street to Rose Street
- Murray Street – Main Street to Dead End
- Rose Street – Greene Terrace to Springside Avenue
- Springside Avenue – Main Street to Cul-de-sac
- Stanley Street – Prospect Street to Main Street
- Sterling Road – Prospect Street to Main Street
- Vine Street – Adam Street to Prospect Street
- Claremont Street – Maplewood Avenue to Park Avenue
- Deerfield Court – Deerfield Avenue to Cul-de-sac
- Deerfield Avenue – Park Avenue to Michael Avenue
- Franklin Street – Park Avenue to Dead End
- Linden Street – Webster Street to Main Street
- Maplewood Avenue – Main Street to Oakland Avenue
- Oakland Avenue – Park Avenue to Dead End
- Webster Street – Woodbridge Avenue to Park Avenue
- Woodbridge Avenue – Main Street to Dead End
- Barbonsel Road – Godar Terrace to Cul de Sac
- Godar Terrace – Forbes Street to Forbes Street
The following streets will be milled and then reconstructed:
- Park Avenue – Main Street to 249’ W of School St.
- Jayce Street – Pitkin Street to East River Drive Extension
The anticipated cost of the project is 4.78 million dollars.
Inspector: Dewberry Engineers Inc.
59 Elm Street, Suite 101
New Haven, CT 06510-0247
Peter Schirmer, P.E., Resident Inspector
Any questions on the Road Program should be directed to the East Hartford Public Works Department, Engineering Division located in the lower level of Town Hall, 740 Main Street, Phone (860) 291-7380. Office hours are Monday through Friday 8:30 AM to 4:30 PM. Specific questions on the 2017 Road Improvement Project should be directed to:
Douglas R. Wilson, P.E.
Civil Engineer, Engineering Division
Phone: (860) 291-7383
Email: dwilson@easthartfordct.gov